Avvad Spaces LLP, Ghatkopar

Service: MEP Design & Engineering

Ghatkopar, Mumbai, MaharashtraResidential

  • Environmental Clearance & MEPF
  • Underground Tank Layout
  • Water Supply & Treatment
  • Sewage Treatment Plant
  • External Sewage
  • Storm Water & Fire Layouts
  • Rainwater Harvesting & Recharge
  • Solar PV & Solar Hot Water Layout
  • EV Charging Layout
Residential wings, A to D, over shops and a fitness centre
4
Of fire water in two underground tanks, as the fire NOC requires
600kL
Treatment stages in the MBBR sewage plant, plus filters and ozone
6
Mechanical car-parking towers with car lifts
2
Solar PV panels, beside 125-litre solar hot-water panels
540W
Deep bores in the rainwater recharge pits
60m
Illustrative dusk render of four residential towers with solar panels on their roofs above a podium of shops, beside a steel mechanical car-parking tower, on a busy Mumbai street
Illustrative image

Project information

A residential and commercial project by Avvad Spaces at Ghatkopar in Mumbai, on a plot bounded by 12.2 m, 9.8 m and 6.1 m roads. Four residential wings, A to D, rise above a ground floor of five shops, residential and commercial entrance lobbies, electrical meter rooms for the wings, a fitness centre and a 6 m fire-engine drive, with a basement and two mechanical car-parking towers served by car lifts. The basement holds the underground water and fire tanks, the pump rooms and the sewage treatment plant. The architecture is the architect's; our scope is the MEPF design and the environmental clearance layouts.

How We Helped Avvad Spaces LLP, Ghatkopar

We issued the external coordinated layouts for the environmental clearance in February 2026 and revised them in May and June 2026, with the EV charging and the solar PV and hot water layouts in May. Water: underground domestic tanks of 27,000 to 35,000 litres for each wing, flushing tanks of 32,000 litres for wings A and D and 28,000 litres for B and C, a 6,000-litre tank for the shops and two 3,00,000-litre fire tanks as the fire NOC requires; the supply from the corporation main, a bore or tankers passes through filtration, a softener and chlorination to hydropneumatic tanks, with recycled water for flushing in its own lines. Sewage: an MBBR plant in the basement - screen chamber, equalisation, anoxic tank, two MBBR stages, a tube settler, ozone disinfection, pressure sand and activated carbon filters and a sludge holding tank - with a sewer trap and drop manhole before the municipal line. Rain: storm water to the road drains, and rooftop and surface water through desiltation pits and a grease-and-oil trap to recharge pits of 2.5 x 2.5 x 2 m, each with a 50 to 60 m bore. Fire: a 150 mm external hydrant ring with single-headed hydrants, 63 mm outlets and hose boxes with 15 m hoses. On the roofs, 540 W solar PV panels and 125-litre solar hot-water panels share the four terraces, and the basement layout places the EV chargers; the DG set's exhaust rises to the terrace and the organic waste converter has a double-height space.

The brief

What the project needed, and how we answered

  1. 01

    Water for four wings and the shops.

    Underground domestic tanks of 27,000 to 35,000 litres for each wing, flushing tanks for each pair of wings and a 6,000-litre tank for the shops, fed from the main, a bore or tankers through filtration, a softener and chlorination.

  2. 02

    Treat the sewage on a tight Mumbai plot.

    An MBBR plant in the basement - equalisation, anoxic tank, two MBBR stages, a tube settler, ozone, sand and carbon filters - returns water for flushing, with a sewer trap before the municipal line.

  3. 03

    Fire water and the clearance.

    Two 3,00,000-litre fire tanks, a 150 mm hydrant ring with hose boxes, recharge pits with bores, solar PV and hot water on the terraces and EV charging in the basement, drawn for the environmental clearance.

System by system

What we designed, with the numbers

Four wings over a basement.

Location
Ghatkopar, Mumbai, between 12.2 m, 9.8 m and 6.1 m roads
Ground floor
Five shops, lobbies, meter rooms, a fitness centre and a 6 m fire-engine drive
Parking
Basement and two mechanical car-parking towers with car lifts

Deliverables

The drawings behind the design

From February to June 2026.

  • 6sheets

    External

    Coordinated, sewage, storm water, water supply and fire layouts and the underground tank layout, R0 to R2 (17 February to 26 June 2026).

  • 2layouts

    Energy

    Solar PV and hot water on the terraces, and EV charging in the basement (30 May 2026).

Why EDGE

15+ years of MEP engineering experience

Every discipline, every building type

HVAC, electrical, plumbing and fire protection for new buildings, renovations, fit-outs and franchise programs — one team, one set of coordinated drawings.

Quality checked by engineers

Every drawing set, model and calculation is reviewed by an experienced engineer before it reaches you.

One partner from design to shop drawings

MEP design, energy compliance and shop drawings from one team — fewer handoffs and a single point of contact.

Next step

Have a similar project?

Send one drawing set and see our work on your own project before you decide.

  • Free, no commitment
  • NDA before any files
  • An engineer replies within one business day