Residential & Commercial Complex, Shirur

Service: MEP Design & Engineering

Shirur, Pune, MaharashtraResidential

  • MEPF
  • Load Demand & Transformer Sizing
  • DG Sets
  • EV Charging
  • Water Demand & Tanks
  • Septic Tanks
  • External & Internal Plumbing
  • Tank Sleeve Details
  • Typical-Flat Electrical Layout
Two-bedroom flats in three buildings, with 54 shops
96
Listed load, 366 kW after diversity, 407 kVA (488 kVA with margin)
732kW
Oil-filled indoor transformer, with 82.5 and 200 kVA diesel sets
630kVA
Car chargers of 7.2 kW, for 20% of 78 bays
16
Water demand: 64.8 for the flats and 10.9 for the shops
75.7kLD
Meter connections: 96 flats, 54 shops and five common
155
Illustrative image of a residential and commercial complex beside a state highway at Shirur: a row of shops, three apartment buildings, a corner transformer yard and farmland behind
Illustrative image

Project information

A residential and commercial complex at Shirur, in the east of Pune district, facing a 60 m state highway: three residential buildings (A, B and C) of a ground floor and six upper floors with 32 two-bedroom flats each of 53 to 59 sq m, and a commercial row of 54 shops of 12 to 26 sq m on the ground floor and the first two floors, with 10,223 sq m of construction. Every flat has its own meter, every shop its own distribution board, and the shops have to be planned so that their outdoor air-conditioning units face the residential open ducts. A meeting with the developer on 10 December 2025 fixed the main points: bedrooms get air-conditioning points with the outdoor unit locations marked, shops get only a distribution board, the transformer room goes in the open space at the corner (25 sq m) with the diesel set above it, service slabs are removed, one underground tank serves the whole project, each building gets a septic tank on the north-east side and every toilet gets a flush tank.

How We Helped Residential & Commercial Complex, Shirur

Electrical: the load sheet of 5 February 2026 adds the flats at 75 W per sq m (426 kW), the shops at 150 W (173 kW), pumps (15 kW), street and landscape lighting and the temple (6 kW) and charging for 20% of 78 car bays (112 kW) - 732 kW, 366 kW after diversity, 407 kVA and 488 kVA with a 20% margin - and a 630 kVA oil-filled indoor transformer, with 155 connections (96 single-phase flats, 54 three-phase shops and five common). Standby: an 82.5 kVA set for the common services and a 200 kVA set for the common services and the shops (276 kVA at 60% diversity). A typical-flat fixture layout was issued on 1 December 2025. Water: 96 flats at 135 litres for 480 people - 64.8 kLD - and 10.9 kLD for the shops, with underground tanks of 67 kL domestic, 17 kL raw and 15 kL drinking water for the flats and 28 kL for the shops, and overhead tanks of 19 kL domestic and 3.2 kL drinking water on each building with a 20 kL fire reserve; the June 2026 tank sleeve details fix the sleeves of a 27.5 kL commercial domestic tank, raw, drinking and residential tanks. Plumbing: the external MEP layout was issued on 17 December 2025 and revised on 5 and 23 February 2026, with chambers, rain-water harvesting pits and the supply inlet from the village, and the internal plumbing layout for every floor was issued on 8 December 2025 and revised through R5 on 19 October 2026.

The brief

What the project needed, and how we answered

  1. 01

    A meter for every home and a board for every shop.

    155 connections: 96 single-phase flat meters, 54 three-phase shop boards and five common meters, with meter panels in each building.

  2. 02

    Standby that matches use.

    An 82.5 kVA set for the common services (72 kVA connected, 58 kVA at 80% diversity) and a 200 kVA set for the common services and the shops (276 kVA at 60%).

  3. 03

    Plan water for a village supply.

    One shared underground tank group: 67 kL domestic, 17 kL raw and 15 kL drinking water for the flats, 28 kL for the shops, with overhead tanks and a fire reserve on each building.

  4. 04

    Charge a fifth of the parking.

    16 chargers of 7.2 kW for 20% of 78 car bays - 112 kW, 15% of the listed load.

  5. 05

    Drain and treat each building separately.

    A septic tank on the north-east of each building, with sewage chambers and rain-water pits drawn on the external layout.

System by system

What we designed, with the numbers

Three residential buildings and a shop row on a state highway.

Location
Shirur, Pune
Construction
10,223 sq m
Residential
3 buildings: ground + 6 floors; 32 two-bedroom flats each, of 53 to 59 sq m (96 in all; 90 in the December 2025 statement)
Commercial
54 shops of 12 to 26 sq m, ground to second floor
Lifts
Two 5 HP lifts in each building and in the shop row

Deliverables

The calculations and drawings behind the design

October 2025 to October 2026.

  • 3statements

    Water & load

    Water demand (R1 11 December 2025, R2 5 February 2026) and load demand with DG sets (5 February 2026).

  • 4issues

    Services layouts

    Internal and external services (31 October 2025) and external MEP, R1 17 December 2025 to R3 23 February 2026.

  • 6issues

    Internal plumbing

    All floors, R0 on 8 December 2025 to R5 on 19 October 2026.

  • 3layouts

    Tanks & electrical

    Tank sleeve details (5 May and 12 June 2026) and the typical-flat electrical fixture layout (1 December 2025).

Engineering data

Where the power goes

The February 2026 load sheet, by use.

Listed load

732 kW

Everything on, before diversity

  • 96 flats, lifts & common lighting425.658%
  • 54 shops172.724%
  • EV charging112.315%
  • Pumps & treatment14.92%
  • Street, landscape & temple61%

Share of 731.5 kW

After diversity
366 kW
With 20% margin
488 kVA
Transformer
630 kVA
Connections
155

Homes are 58% of the load and shops 24%; charging for 16 cars is 15% - the largest item after the homes and shops.

Why EDGE

15+ years of MEP engineering experience

Every discipline, every building type

HVAC, electrical, plumbing and fire protection for new buildings, renovations, fit-outs and franchise programs — one team, one set of coordinated drawings.

Quality checked by engineers

Every drawing set, model and calculation is reviewed by an experienced engineer before it reaches you.

One partner from design to shop drawings

MEP design, energy compliance and shop drawings from one team — fewer handoffs and a single point of contact.

Next step

Have a similar project?

Send one drawing set and see our work on your own project before you decide.

  • Free, no commitment
  • NDA before any files
  • An engineer replies within one business day