American Edge Engineers

MEP Design

The MEP Data an Environmental Clearance Application Needs

The calculations and drawings the MEP engineer prepares for a building project's environmental clearance, how they fit together, and figures from projects we have submitted.

American Edge Engineers ·

01

What the MEP engineer contributes

An environmental clearance application describes how a project will use water, energy and land, and how it will deal with its sewage, storm water and waste. Much of that is building services: how much water the people in the building will use and where it comes from, how the sewage is treated and reused, how much power the building draws and how much of it is saved or generated on site.

The environmental consultant puts the application together; the MEP engineer works out those figures and draws the layouts that show them. For larger residential and commercial projects in India, the application is appraised by the state expert appraisal committee, and the figures are checked against each other, so they have to be worked out together rather than collected from different people.

02

The calculations

A typical residential or commercial EC set includes:

  • Population: residents per flat, and staff and visitors for the shops and offices
  • Water demand: domestic, flushing, landscape and any pool, with the source of each
  • Sewage generated, the treatment plant size, and how the treated water is reused
  • Connected load and maximum demand, with the transformer and DG set sizes
  • Energy conservation measures and the saving they give, with the ECBC parameters
  • Rooftop solar power and solar hot water
  • EV charging points for cars and two-wheelers, and the load they add
  • Fire water storage and pumps
  • Rainwater harvesting and storm water
  • Basement ventilation, normally and in a fire, and basement dewatering
03

The drawings

Layouts usually submitted with the EC data
LayoutWhat it shows
External MEP servicesWater, drainage, sewage plant, tanks and electrical routes around the buildings
External plumbingWater supply, drainage and storm water lines to the municipal connections
SolarPanel layout on the roofs and the solar hot water system
EV chargingCharging points in the parking levels and their supply
Lightning protectionAir terminals, down conductors and earthing
Basement ventilation & dewateringFans, sensors, air changes and the sumps and pumps
Rainwater harvestingRecharge pits and storage, and how the roof and site water reach them
04

Figures from real projects

The scale of the numbers depends on the population and the uses on the plot. Three projects we prepared the EC data for:

What the figures show

On the Kiwale towers, 158 EV charging points add 755 kW, almost a third of the connected load, which is why charging has to be in the load calculation from the start. On the Wakad project, the towers and the commercial wing each have their own sewage plant, DG set and tanks, so the EC data is worked out for each part as well as for the whole. The Indapur plant shows the same set of figures for an industrial building, with effluent treatment alongside the sewage.

EC figures from three of our projects
ProjectAreaWater and sewagePowerSolar
Two towers and a commercial wing, Wakad, Pune64,887 sq m built-upAbout 209 kL a day; two plants of 195 KLD3,320 kW connected, 1,791 kW maximum demandAbout 128 kW
Two residential towers, Kiwale, Pune27,786 sq m of constructionAbout 182 kL a day; a 170 KLD plant2,392 kW connected, 1,274 kW maximum demand102 kW
Edible oil plant, MIDC Indapur28,795 sq m built-upWater, sewage and effluent treatment3,561 kW342 kW
05

Keep the figures consistent through the revisions

The plans change while the application is being prepared - a floor is added, a wing changes use, the parking is replanned - and every change moves the population, the water, the sewage and the load. On the Wakad project, the water demand went through four revisions, the energy calculation through four, and the EC layouts to their fifth issue before the project went to the committee.

The simplest protection is to work every figure from one population and one area statement, and to revise the water, energy and drawings together, so the committee never sees a sewage plant sized for a different number of people than the water demand.

06

What to send

To prepare the MEP data for an EC application, we need:

  • The area statement and the architectural plans, sections and site plan
  • The number and size of flats, and the use of every commercial floor
  • Parking numbers for cars and two-wheelers, by level
  • The water supply and drainage NOCs, if already applied for
  • The environmental consultant's format, if they have one
07

Our EC work

We have prepared the MEP data and layouts for environmental clearance on residential towers, mixed-use redevelopments and factories across Pune and Mumbai, usually alongside the full MEPF design - see MEP consultants in Pune or our MEP design service.

Next step

Learn how our MEP Design & Engineering service works, or send us one drawing set for a free project review and decide after you see our work.

All insights