Sample project. This page illustrates how we document a project like this. Names, sizes and figures are illustrative, not a record of completed work.
55 PALISADE AVENUE YONKERS,NY 10701
Service: MEP Design & Engineering
Yonkers, NYHealth + Wellness
- Mechanical
- Electrical
- Plumbing
- Fire Sprinkler & Standpipe
- Energy Compliance (COMcheck)
- Backflow Applications
- DOB Filing Sets
- Levels, from the pool hall to the roof (about 50 ft)
- 5
- Therapy pool, with a dedicated dehumidification unit
- 20×40 ft
- VRF heat pump capacity across 4 outdoor units
- 54tons
- Gas-fired rooftop units (2 × 12.5-ton)
- 25tons
- Sprinkler and hose demand, calculated against a city hydrant test
- 520gpm
- Drawing sheets in the mechanical, plumbing, sprinkler and energy sets
- 45

Project information
A new outpatient rehabilitation building with a hydrotherapy pool hall on the lower level, a therapy gym and treatment rooms on the floors above and a roof with the main plant. A pool hall puts a constant moisture load on the air, so the ventilation and dehumidification have to be sized separately from the clinical floors, and every pipe and duct in the hall must resist chlorine and humidity. Like every New York project, the design also has to satisfy the NYC Construction Codes and the city's energy code requirements.
How We Helped 55 PALISADE AVENUE YONKERS,NY 10701
Mechanical: we scheduled ventilation room by room for about 30,500 ft² of rooms, with the highest outdoor-air rate on pool hall. Heating and cooling come from a VRF heat pump system of 4 outdoor units totalling about 54 tons and 52 indoor units, backed by 2 12.5-ton gas-fired rooftop units and 1 energy-recovery ventilator. A dedicated dehumidifying unit holds the hall at 84°F and 55% relative humidity, with stainless steel ductwork, a separate exhaust and a gas-fired pool heater and filtration plant. Electrical: we scheduled the power connection for every rooftop unit, VRF unit, fan, heater and pump — voltage, phase, minimum circuit ampacity and overcurrent protection — and sized the building service for the connected load. Plumbing: A triplex variable-speed booster set supplies domestic water, two 119-gallon gas-fired heaters supply hot water, the pool has its own make-up, overflow and backwash piping, and a duplex sump drains the lower level. Fire protection: a wet sprinkler system on a 6-inch combined sprinkler and standpipe riser with a fire pump and jockey pump, hydraulically calculated at about 520 gpm against the city hydrant test. We also prepared the COMcheck energy analysis, the backflow prevention applications and the mechanical, plumbing and sprinkler sets for filing.
The brief
What the project needed, and how we answered
- 01
Control humidity and chlorine in a hydrotherapy pool hall.
A dedicated dehumidifying unit holds the hall at 84°F and 55% relative humidity, with stainless steel ductwork, a separate exhaust and a gas-fired pool heater and filtration plant.
- 02
Heat and cool every room of the rehabilitation and hydrotherapy centre with its own comfort setting.
A VRF heat pump system of 4 outdoor units (10, 14, 14, 16 tons) serves 52 indoor units, so every exam room, treatment bay and office is controlled on its own.
- 03
Bring in enough fresh air for a building with little roof space.
2 12.5-ton gas-fired rooftop units with reheat and economizers, plus 1 energy-recovery ventilator, deliver about 6,850 cfm of outdoor air across the scheduled rooms.
- 04
Get water in and waste out reliably.
A triplex variable-speed booster set supplies domestic water, two 119-gallon gas-fired heaters supply hot water, the pool has its own make-up, overflow and backwash piping, and a duplex sump drains the lower level.
- 05
Power every unit, pump and heater safely, with a service sized for the load.
Each piece of equipment was scheduled with its voltage, phase and circuit ampacity, from 2 rooftop units and 4 VRF outdoor units at 460 V, 3-phase down to 120 V unit heaters, and the building service was sized to the total.
- 06
Protect the building in a fire.
A wet sprinkler system on a 6-inch combined sprinkler and standpipe riser, a fire pump and jockey pump and street connections for the fire department.
- 07
Clear the approvals that gate construction.
We prepared the COMcheck energy analysis, the backflow prevention applications, the hydraulic calculations and the mechanical, plumbing and sprinkler sets for filing.
System by system
What we designed, with the numbers
An air-cooled VRF system: 4 outdoor heat pump units feed 52 ducted and ceiling-type indoor units, each with its own thermostat and condensate pump.
- Outdoor units
- 4 units: 10, 14, 14, 16 tons — 54 tons nominal
- Cooling capacity
- About 648,000 Btu/h in all
- Indoor units
- 52 units, 0.5 to 3 tons
- Refrigerant
- R-410A, with long-line sets where piping exceeds standard lengths
- Electrical
- 460 V, 3-phase outdoor units; 208–230 V, 1-phase indoor units
- Controls
- Low-ambient operation, compressor cycle protection, MERV 8 filters on returns
Building cross-section
Inside the building, level by level
Select a level to see what we designed on it. Elevations are the project datum shown on the riser diagrams; street 74.00.
Drawn to scale from the floor-to-floor heights · numbers are elevations in feet
EL 60.00 ft
Pool hall level
The therapy pool hall, the pool plant room, the booster pumps and the fire pump.
- Rooms scheduled
- 6,800 ft²
- Pool
- 20 × 40 ft
- Hall air
- 7,500 cfm
Mechanical
Dedicated pool-hall dehumidification, stainless steel ductwork and a separate hall exhaust.
Plumbing
Pool heater, filtration, make-up and backwash piping, the duplex sump and the triplex booster set.
Fire protection
Fire pump and jockey pump with a test header, riser control valves and a 2-inch drain.
Electrical
208 V, 3-phase feeds for the booster, sump and ejector pumps, with float or pressure controls and high-level alarms.
Deliverables
What we issued
The filing sets and the calculations behind them.
20sheets
Mechanical
Plans for every level, air-flow and refrigerant risers, details and equipment schedules
14sheets
Plumbing
Plans, sanitary, gas and storm risers, details and schedules
7sheets
Sprinkler & standpipe
Plans for all levels, specifications, details and the riser diagram
4sheets
Energy analysis
COMcheck mechanical and plumbing compliance, certificates and inspection checklists
16pages
Hydraulic calculations
Node and pipe data, supply curve and demand for the sprinkler design
3sheets
Backflow applications
Fire and domestic service plans and application forms
Engineering data
Where the building's air goes
We scheduled outdoor air and exhaust for every room. The bars show how those flows are shared between the levels, and why pool hall leads.
Outdoor air supplied
6,850 cfm in total
Design flow to rooms, by level
- Pool hall41%
- First floor22%
- Second floor20%
- Third floor18%
Share of 6,850 cfm
Air exhausted
4,400 cfm in total
Design flow from rooms, by level
- Pool hall70%
- First floor11%
- Second floor10%
- Third floor9%
Share of 4,400 cfm
- Rooms scheduled
- 30,500 ft²
- Outdoor air
- 6,850 cfm
- Exhaust
- 4,400 cfm
- Indoor units
- 52
Pool hall takes 41% of the building's outdoor air, which is why it has the most careful air-flow design.
Fire water
Why the building needs a fire pump
We calculated the sprinkler system against a flow test on the city main. At the flow the sprinklers and hose stream demand, the street cannot deliver the pressure the top of the system needs, so the fire pump closes the gap.
- Test
- Hydrant flow test on the city main
- Static pressure
- 54 psi
- Residual
- 46 psi at 750 gpm
- System demand
- 520 gpm at 64 psi
- Hazard
- Light, wet system
- Hose allowance
- 100 gpm
The system's demand sits about 14 psi above the flow-test curve at 520 gpm, so the fire pump supplies the difference.
Why EDGE
15+ years of MEP engineering experience
Every discipline, every building type
HVAC, electrical, plumbing and fire protection for new buildings, renovations, fit-outs and franchise programs — one team, one set of coordinated drawings.
Quality checked by engineers
Every drawing set, model and calculation is reviewed by an experienced engineer before it reaches you.
One partner from design to shop drawings
MEP design, energy compliance and shop drawings from one team — fewer handoffs and a single point of contact.
Next step
Have a similar project?
Send one drawing set and see our work on your own project before you decide.
- Free, no commitment
- NDA before any files
- An engineer replies within one business day