Aaiji Developers Residential Project, Balewadi
Service: MEP Design & Engineering
Balewadi, Pune, MaharashtraResidential
- MEPF Design
- Load Demand
- Transformer & DG Sizing
- Meter Panel Distribution
- Water Demand & Storage
- Drinking Water
- Sewage Treatment
- Fire Fighting
- Basement Ventilation & Dewatering
- EV Charging
- Three-bedroom flats over thirteen floors, for 325 residents
- 65
- Connected load, 332 kW of maximum demand, on a 630 kVA transformer
- 673kW
- Supply to every flat: 68 connections on four meter panels
- 3-phase
- Water a day, drinking water on its own line
- 43.88kL
- Underground fire tank, with 20 kL more on the terrace
- 75kL
- DG set for the lifts, pumps, ventilation and common lighting
- 100kVA

Project information
A residential building by Aaiji Developers at Balewadi, in north-west Pune: a basement of parking, a ground floor and thirteen residential floors with a terrace, holding 65 three-bedroom flats of about 98 to 105 sq m carpet area - five on each floor - for an estimated 325 residents, served by three lifts. Flats of this size carry air conditioning and heavier appliances, so each takes a three-phase supply. The architecture is the architect's; our scope is the MEPF design.
How We Helped Aaiji Developers Residential Project, Balewadi
We prepared the calculations in July 2026. Power: every flat at 75 W per sq m of carpet area, three 15 HP lifts, the domestic, drinking-water, booster, sewage, sump and sub-soil pumps, the water treatment plant and organic waste converter, basement ventilation and staircase pressurisation, street lighting and EV charging for 20% of the 57 car bays - 11 chargers of 7.2 kW - for 673 kW connected and 332 kW of maximum demand: 369 kVA, or 443 kVA with a 20% margin, on a 630 kVA transformer, with 68 three-phase connections - 65 flats and 3 common - grouped floor by floor on four meter panels; and a 100 kVA DG set for the lifts, pumps, ventilation and common lighting at 80% diversity. Water: 325 residents at 135 litres a day - 115 litres of domestic and 20 litres of drinking water on separate pipes - 43.88 kL a day, with underground tanks of 38 kL domestic, 19 kL raw and 10 kL drinking water and a 75 kL fire tank, terrace tanks of 38 kL domestic, 7 kL drinking and 20 kL fire, and 39.49 kL a day of sewage to a 40 KLD treatment unit. Fire: hydrant, sprinkler and jockey pumps drawing on the underground fire tank.
The brief
What the project needed, and how we answered
- 01
Large flats that need a three-phase supply.
Flats of 98 to 105 sq m with air conditioning and heavy appliances each take a three-phase supply - 65 flat connections and 3 common - grouped floor by floor on four meter panels.
- 02
A transformer sized with margin.
673 kW connected comes down to 332 kW of maximum demand, 369 kVA - 443 kVA with a 20% margin - on a 630 kVA transformer.
- 03
Drinking water kept apart.
Of the 135 litres a resident uses each day, 20 are drinking water with their own tanks (10 kL underground, 7 kL on the terrace), pump and treatment.
- 04
A dry, ventilated basement.
Basement sump and sub-soil pumps keep the parking dry, and ventilation fans and staircase pressurisation keep the air moving and the stairs clear of smoke.
System by system
What we designed, with the numbers
A thirteen-storey residential building in Balewadi.
- Location
- Balewadi, Pune
- Floors
- Basement, ground and thirteen residential floors with a terrace
- Flats
- 65 three-bedroom flats of about 98 to 105 sq m, five a floor
- Lifts
- Three of 15 HP
Deliverables
The calculations behind the design
Calculations in July 2026.
2revisions
Water demand
R0 on 1 July and R1 on 15 July 2026: demand, tanks and sewage treatment.
673kW connected
Load demand & DG
Flats, lifts, pumps, fans and EV charging, with transformer, DG set and meter panel distribution (1 July 2026).
Engineering data
Where the power goes
Every flat at 75 W per sq m of carpet area, then the lifts, pumps, fans and chargers line by line, with the diversity factors applied.
Connected load
673 kW
Everything running, before diversity
- 65 flats491.173%
- EV charging (11)82.112%
- Lifts & common lighting36.65%
- Water, sewage & sump pumps32.85%
- Ventilation & pressurisation254%
- Street lighting51%
Share of 672.52 kW
Maximum demand
332 kW
After diversity: what the transformer serves
- 65 flats245.574%
- EV charging (11)4112%
- Lifts & common lighting18.36%
- Water, sewage & sump pumps16.45%
- Ventilation7.52%
- Street lighting2.51%
Share of 331.27 kW
- At 0.9 power factor
- 369 kVA
- With 20% margin
- 443 kVA
- Transformer
- 630 kVA
- DG set
- 100 kVA
The 65 flats are 73% of the connected load; charging for eleven bays is next at 82 kW - more than the three lifts and all the pumps together.
Why EDGE
15+ years of MEP engineering experience
Every discipline, every building type
HVAC, electrical, plumbing and fire protection for new buildings, renovations, fit-outs and franchise programs — one team, one set of coordinated drawings.
Quality checked by engineers
Every drawing set, model and calculation is reviewed by an experienced engineer before it reaches you.
One partner from design to shop drawings
MEP design, energy compliance and shop drawings from one team — fewer handoffs and a single point of contact.
Next step
Have a similar project?
Send one drawing set and see our work on your own project before you decide.