American Edge Engineers
26 / 73

Aaiji Developers Residential Project, Balewadi

Service: MEP Design & Engineering

Balewadi, Pune, MaharashtraResidential

  • MEPF Design
  • Load Demand
  • Transformer & DG Sizing
  • Meter Panel Distribution
  • Water Demand & Storage
  • Drinking Water
  • Sewage Treatment
  • Fire Fighting
  • Basement Ventilation & Dewatering
  • EV Charging
Three-bedroom flats over thirteen floors, for 325 residents
65
Connected load, 332 kW of maximum demand, on a 630 kVA transformer
673kW
Supply to every flat: 68 connections on four meter panels
3-phase
Water a day, drinking water on its own line
43.88kL
Underground fire tank, with 20 kL more on the terrace
75kL
DG set for the lifts, pumps, ventilation and common lighting
100kVA
Illustrative render at dusk of a residential tower with wide balconies and timber-toned panels, a lit glass entrance lobby, a landscaped forecourt, a gated entry with a security cabin and a ramp down to the basement
Illustrative image

Project information

A residential building by Aaiji Developers at Balewadi, in north-west Pune: a basement of parking, a ground floor and thirteen residential floors with a terrace, holding 65 three-bedroom flats of about 98 to 105 sq m carpet area - five on each floor - for an estimated 325 residents, served by three lifts. Flats of this size carry air conditioning and heavier appliances, so each takes a three-phase supply. The architecture is the architect's; our scope is the MEPF design.

How We Helped Aaiji Developers Residential Project, Balewadi

We prepared the calculations in July 2026. Power: every flat at 75 W per sq m of carpet area, three 15 HP lifts, the domestic, drinking-water, booster, sewage, sump and sub-soil pumps, the water treatment plant and organic waste converter, basement ventilation and staircase pressurisation, street lighting and EV charging for 20% of the 57 car bays - 11 chargers of 7.2 kW - for 673 kW connected and 332 kW of maximum demand: 369 kVA, or 443 kVA with a 20% margin, on a 630 kVA transformer, with 68 three-phase connections - 65 flats and 3 common - grouped floor by floor on four meter panels; and a 100 kVA DG set for the lifts, pumps, ventilation and common lighting at 80% diversity. Water: 325 residents at 135 litres a day - 115 litres of domestic and 20 litres of drinking water on separate pipes - 43.88 kL a day, with underground tanks of 38 kL domestic, 19 kL raw and 10 kL drinking water and a 75 kL fire tank, terrace tanks of 38 kL domestic, 7 kL drinking and 20 kL fire, and 39.49 kL a day of sewage to a 40 KLD treatment unit. Fire: hydrant, sprinkler and jockey pumps drawing on the underground fire tank.

The brief

What the project needed, and how we answered

  1. 01

    Large flats that need a three-phase supply.

    Flats of 98 to 105 sq m with air conditioning and heavy appliances each take a three-phase supply - 65 flat connections and 3 common - grouped floor by floor on four meter panels.

  2. 02

    A transformer sized with margin.

    673 kW connected comes down to 332 kW of maximum demand, 369 kVA - 443 kVA with a 20% margin - on a 630 kVA transformer.

  3. 03

    Drinking water kept apart.

    Of the 135 litres a resident uses each day, 20 are drinking water with their own tanks (10 kL underground, 7 kL on the terrace), pump and treatment.

  4. 04

    A dry, ventilated basement.

    Basement sump and sub-soil pumps keep the parking dry, and ventilation fans and staircase pressurisation keep the air moving and the stairs clear of smoke.

System by system

What we designed, with the numbers

A thirteen-storey residential building in Balewadi.

Location
Balewadi, Pune
Floors
Basement, ground and thirteen residential floors with a terrace
Flats
65 three-bedroom flats of about 98 to 105 sq m, five a floor
Lifts
Three of 15 HP

Deliverables

The calculations behind the design

Calculations in July 2026.

  • 2revisions

    Water demand

    R0 on 1 July and R1 on 15 July 2026: demand, tanks and sewage treatment.

  • 673kW connected

    Load demand & DG

    Flats, lifts, pumps, fans and EV charging, with transformer, DG set and meter panel distribution (1 July 2026).

Engineering data

Where the power goes

Every flat at 75 W per sq m of carpet area, then the lifts, pumps, fans and chargers line by line, with the diversity factors applied.

Connected load

673 kW

Everything running, before diversity

  • 65 flats491.173%
  • EV charging (11)82.112%
  • Lifts & common lighting36.65%
  • Water, sewage & sump pumps32.85%
  • Ventilation & pressurisation254%
  • Street lighting51%

Share of 672.52 kW

Maximum demand

332 kW

After diversity: what the transformer serves

  • 65 flats245.574%
  • EV charging (11)4112%
  • Lifts & common lighting18.36%
  • Water, sewage & sump pumps16.45%
  • Ventilation7.52%
  • Street lighting2.51%

Share of 331.27 kW

At 0.9 power factor
369 kVA
With 20% margin
443 kVA
Transformer
630 kVA
DG set
100 kVA

The 65 flats are 73% of the connected load; charging for eleven bays is next at 82 kW - more than the three lifts and all the pumps together.

Why EDGE

15+ years of MEP engineering experience

Every discipline, every building type

HVAC, electrical, plumbing and fire protection for new buildings, renovations, fit-outs and franchise programs — one team, one set of coordinated drawings.

Quality checked by engineers

Every drawing set, model and calculation is reviewed by an experienced engineer before it reaches you.

One partner from design to shop drawings

MEP design, energy compliance and shop drawings from one team — fewer handoffs and a single point of contact.

Next step