Beacon Commons
Service: MEP Shop Drawings & BIM Coordination
New York City, NYResidential
- Complete MEP & Fire Protection
- Mechanical
- Electrical
- Plumbing
- Fire Sprinkler & Fire Alarm
- Storeys, cellar to roof
- 10+
- Shop drawing submission rounds
- 25+
- Bedroom apartment types
- 1–3
- Of submissions
- ≈8months
- Drawing types: duct, piping, risers, air devices, overhead
- 5
- Core-drilling plans for typical floors
- VRF

Project information
A new affordable housing building of more than 10 storeys with one-, two- and three-bedroom apartments, including income-restricted and accessible units, above a cellar with the fire pump, plumbing and building services rooms. Apartments are heated and cooled by VRF, with ventilation and bathroom and kitchen exhaust on shared risers, so every duct, pipe and core drilling has to be coordinated floor by floor before the trades build. Like every New York project, the design also has to satisfy the NYC Construction Codes and the city's energy code requirements.
How We Helped Beacon Commons
We produced the mechanical contractor's shop drawings for the whole building: sheet metal plans with duct dimensions from the cellar to the top floor, mechanical piping plans, duct riser diagrams, air-device plans and overhead coordination drawings combining the MEP trades, plus VRF core-drilling plans for the typical floors and a roof model for clash checking. The set was issued over about eight months in more than 25 submission rounds as floors were released, reviewed and revised.
The brief
What the project needed, and how we answered
- 01
Turn the design into buildable duct and pipe layouts, floor by floor.
Sheet metal plans with duct dimensions and mechanical piping plans for every level from the cellar to the top floor.
- 02
Coordinate tight ceilings in an apartment building.
Overhead coordination drawings combining the MEP trades, plus a roof model for clash checking.
- 03
Drill slabs for VRF piping in the right places.
VRF core-drilling plans for the typical floors, so slab penetrations land where the piping needs them.
- 04
Keep pace with a building released in stages.
More than 25 submission rounds as floors were released, reviewed and revised.
System by system
What we designed, with the numbers
The mechanical contractor's full set, cellar to roof.
- Sheet metal
- Every floor, with duct dimensions
- Piping
- Mechanical piping plans
- Risers
- Duct riser diagrams
- Air devices
- Air-device plans for every floor
- Overhead
- Coordinated MEP overhead drawings
Why EDGE
15+ years of MEP engineering experience
Every discipline, every building type
HVAC, electrical, plumbing and fire protection for new buildings, renovations, fit-outs and franchise programs — one team, one set of coordinated drawings.
Quality checked by engineers
Every drawing set, model and calculation is reviewed by an experienced engineer before it reaches you.
One partner from design to shop drawings
MEP design, energy compliance and shop drawings from one team — fewer handoffs and a single point of contact.
Next step
Have a similar project?
Send one drawing set and see our work on your own project before you decide.
- Free, no commitment
- NDA before any files
- An engineer replies within one business day